The equipment must fit through the doors—not just inside
Check width, height, length, mirrors, handlebars, attachments, ramps, tie-down plans, and the turning path into the container. Fuel, batteries, ventilation, fluids, and fire safety may require specific precautions or another storage approach.
Door clearance
Compare the machine at its widest and tallest points with the quoted unit’s actual door opening.
Safe loading
Use suitable ramps and procedures for the equipment weight and approach angle; do not improvise unsafe loading methods.
Storage environment
Plan ventilation, condensation control, battery care, fluid management, and security for the equipment being stored.
What to include with your request
- Measure the full equipment dimensions and turning path.
- Confirm actual door-opening and interior dimensions.
- Plan safe loading, tie-downs, ventilation, and fluid control.
- Allow room to enter, exit, and retrieve equipment safely.
