Drainage starts below the container
A pad should direct water away rather than create a low basin.
Understand aggregate-pad planning questions before delivery, while reserving site-specific design for qualified local professionals.

A pad should direct water away rather than create a low basin.
Loose surface stone does not provide the same support as a prepared base.
Soil, frost, use, loads and local rules change the appropriate design.
Allow for the container, door operation, inspection and drainage. Confirm where the unit should bear and whether full-pad or localized support is appropriate for the project.
Excavation depth, geotextile, aggregate type and compaction are site-specific. Ask qualified contractors or engineers where soil, slopes, permanence or structural use creates uncertainty.
Start with your province or territory, then choose a community for local delivery planning. Availability and transport are confirmed with your quote.
Share the destination and preferred container. Choose “Not Sure” wherever you want help deciding.