A shipping container can be used at a mine site when the mine manager approves the defined surface use under the site permit, operating rules and applicable mining law. It can hold suitable tools, spares or emergency equipment, but it is not automatically approved for explosives, fuel, chemicals, occupancy or underground use. Mine traffic, severe weather, ground support, lifting, remote work and eventual removal all belong in the written plan.
Begin with the mine’s management-of-change process
Classify the contents before the steel box
Place it outside mobile-equipment conflict
Treat foundation, anchorage and lifting as site engineering questions
Remote access needs a check-in and rescue path
Design the cache for loss of normal access
Close the mine-site life cycle
Review the site and contents before transport
Provide mine approval, the exact inventory, proposed pad, traffic map, lifting method and closure trigger so the container is quoted as part of an operating plan.